Good morning, Mahmoud

Staged day: Tuesday 20 October 2026. You teach day 3 of B31.3 Process Piping today; everything that needs you before and after the session is on this page.

Staged day, 20 Oct
Day 3 of 5
PD643, 09:00 to 15:00 Cairo time
Learners in class this week
17
16 joined yesterday, 1 excused
Submissions to grade
9
3 are older than 5 days
Evaluation score, last 3 batches
4.7 / 5
Sample figure, 41 responses

Today's session

Room opens 08:45
B-2611Virtual classroom

ASME authorized program. Official ASME slides are loaded in the classroom; you cannot edit them, you can annotate on screen.

TimeAgenda, day 3TypeMaterial
09:00Recap of day 2 and open questions on wall thicknessDiscussionDay 2 quiz results
09:30Case study 2: branch connectionsCase studyWorked example, sheet CS2
11:00Case study 3: flange pressure rating, parts 1 and 2Case studyWorked example, sheet CS3
12:30Break
13:00Module 5: fluid service requirements and standards for piping componentsLectureASME deck, module 5
14:30Day 3 review quiz, 10 questionsQuizAuto-graded, results in Assessments
Recording and attendance capture start when you open the room.See the full five-day agenda

Next sessions

All my sessions
BatchCourseDatesDeliveryEnrolledStatus

Grading queue

Open assessments
SubmissionBatchWaitingOldestDue back to learners
RCA method selection exercise
Root Cause Analysis, the right tool, final assignment
B-260939 daysOverdue since 15 OctGrade
Case study 1: pipe wall thickness
B31.3 Process Piping, day 2 hand-in
B-261151 dayBefore day 4 startsGrade
Final assessment, open questions
B31.1 Power Piping, re-sit
B-260412 daysBy 25 OctGrade
Certificates for B-2609 are held until the three overdue assignments are graded.

You also hold the Owner / CEO role

Switch workspace

Both workspaces read the same records. Nothing is copied: a batch has one number, one roster and one decision date whichever role you are in. Responsibility profile

Suggested by the assistant. Three learners in B-2611 scored under 60% on the day 2 quiz, all on the same two questions about weld joint quality factor. A five-minute recap at 09:00 would cover it.
See the quiz breakdown

Rosters to review

B-2611, PD643
2 learners at risk of missing the attendance threshold. Day 3 not yet submitted.
Review

B-2614, ML510
6 of 20 enrolled, below the minimum of 9. Operations decide by whether it runs.
At risk

B-2618, ML516
Sample EPC Contractors sent 15 names. 2 have less than the 5 years of experience you asked for.

Messages from operations

All messages
  • Sample Gas Pipelines asked for B31.8 in-house, 29 Nov to 3 Dec. Please accept or decline the dates in Availability.
  • Ibrahim Saleh had a power cut during day 2. I marked him excused; please confirm on the roster.
  • September statement is ready. will be paid on 25 Oct. See payouts.
  • Three ML517 assignments from B-2609 are still ungraded and learners are asking about certificates.
  • Could you record a two-minute introduction for the ML510 page? Six seats sold so far.

Learner evaluations

Sample data

Average of the end-of-course forms from B-2598, B-2604 and B-2609. Scale 1 to 5.

Subject knowledge
4.9
Clarity of explanation
4.7
Worked examples
4.8
Pace
4.2
Time for questions
4.5

Most frequent comment: more time for the flexibility exercises on day 4.